Wednesday, December 17, 2014

MS-HS Addition and Remodeling, December 17, 2014

12-16-14 Ag Classroom
12-16-14 Ag Classroom/Shop
12-16-14 Ag-Tech Bathroom
12-16-14 Innovations Lab
12-16-14 Innovations Lab
12-16-14 Meats Lab Cooler
12-16-14 Meats Lab

Thursday, December 4, 2014

MS-HS Addition and Remodeling, December 4, 2014

Ag-Tech addition developments over the past month include:

  • Drywall in the classroom areas;
  • Walls, ceilings, door, and frames painted;
  • Canopy above the recycling area;
  • A new fire-rated overhead door between the existing wood shop and new metals shop;
  • Final adjustments to the new dust collection system in the wood shop;
  • Flooring in the Innovations Lab, Ag Classroom, and Meats Lab.

Important details to be completed over the next two weeks:

  • Final rooftop unit installation;
  • Cooler install in the meats lab;
  • Venting for specialized Innovations lab equipment;
  • Casework installation;
  • Transfer of existing equipment;
  • Final testing and balancing;
  • Occupancy approval from state inspectors;
  • Phone and data connections;
  • Security install (Doors and Cameras).

The project will be substantially complete by January 1.  By the start of second semester, agriculture, mechanical systems, and job skills classes will be using these new spaces.
12-4-14 Ag Classroom
12-4-14 Ag Office
12-4-14 Ag Shop
12-4-14 Dark Room
12-4-14 Innovations Lab
12-4-14 Innovations Lab
12-4-14 Meats Lab
12-4-14 Metals Lab
12-4-14 Welding Booths